
BMW Swindon
Installation and connection of robot cells and control cabinets.
At BMW Swindon a nine-person BMJB crew spent eight months installing and connecting robot cells and their control cabinets, from floor cable routes to the robot bases through to cabinet wiring and final connections.
BMJB's role
Installation crew with own foreman, tools and logistics
