Cable trays with power and data cables on the production floor

BMW Swindon

Installation and connection of robot cells and control cabinets.

Industry
Automotive
Location
Swindon, United Kingdom
Year
2023–2024
Team
9 people
Duration
8 months
Client / end user
BMW

At BMW Swindon a nine-person BMJB crew spent eight months installing and connecting robot cells and their control cabinets, from floor cable routes to the robot bases through to cabinet wiring and final connections.