
Conveyor installation, Krefeld
Cable routes, cabling and connections for conveyor lines and their distributed control cabinets.
In Krefeld a five-person BMJB crew installed cable routes along conveyor lines, laid the power and control cables, and connected the distributed I/O cabinets, drives and sensors over five months.
BMJB's role
Installation crew with own foreman, tools and logistics
