
Logistics hall, Evergem
Electrical infrastructure, cable routes, cabling and connections in a large logistics hall.
For the Willy Naessens Group in Evergem near Ghent, an eight-person BMJB crew spent six months installing electrical infrastructure in a high-bay logistics hall: cable routes at height, cabling, distribution boards and connections.
BMJB's role
Installation crew with own foreman, tools and logistics
